Skip to main content

Sump Pump Discharge Review Project

Councillors and Administration have received complaints from homeowners and home builders in new neighbourhoods of the perpetual pumping of foundation drainage sump pumps to the surface resulting in saturated soil conditions in yards or parks, and algae or ice build up on driveways, sidewalks, and lanes. Additionally, water from weeping tiles connected to the sanitary sewer system is being unnecessarily treated by the wastewater treatment plant at additional cost and utilizing unnecessary capacity.

This has been an issue in Saskatoon for many years with different methods utilized to attempt to mitigate the problem without substantial success or that come with additional costs or concerns.

Feedback from engagement will help to provide direction on mitigation options.

Water overflowing from a house onto the street.
Sump pump

Please note: This project was moved from our previous engagement website, and some of the tools and information may appear different than originally designed or other projects on this platform.

Phases

Phases overview
Phase 1: Online survey for residents
Online survey for residents
Phase 2: Analysis of engagement and research into best practices
Analysis of engagement and research into best practices
Phase 3: Industry and developer engagement
Industry and developer engagement

Next steps

November 23, 2026 6:00 AM - December 30, 2026 5:59 AM

Depending on the impact of the recommended mitigation option, the assessment report is expected to be either presented to Administration senior leadership or Council, as appropriate in early 2027.

To receive updates on this project, please click on the "Follow" button.