Sump Pump Discharge Review Project

Councillors and Administration have received complaints from homeowners and home builders in new neighbourhoods of the perpetual pumping of foundation drainage sump pumps to the surface resulting in saturated soil conditions in yards or parks, and algae or ice build up on driveways, sidewalks, and lanes. Additionally, water from weeping tiles connected to the sanitary sewer system is being unnecessarily treated by the wastewater treatment plant at additional cost and utilizing unnecessary capacity.

This has been an issue in Saskatoon for many years with different methods utilized to attempt to mitigate the problem without substantial success or that come with additional costs or concerns.

Feedback from engagement will help to provide direction on mitigation options.

Water overflowing from a house onto the street.
Sump pump

Please note: This project was moved from our previous engagement website, and some of the tools and information may appear different than originally designed or other projects on this platform.

Phases

Phases overview
Phase 1: Online survey for residents
Online survey for residents
Phase 2: Analysis of engagement and research into best practices
Analysis of engagement and research into best practices
Phase 3: Industry and developer engagement
Industry and developer engagement

Industry and developer engagement

September 24, 2026 2:00 PM - October 15, 2026 5:59 AM

Engagement is scheduled for September with developers, home builders, civil and geotechnical consultants to present these proposed options, and determine which will be most effective both in mitigating the issue and financially.