Skip to main content
Apple trees

Food Forests

The City installed two food forest demonstration sites in 2025 to provide publicly accessible, edible landscapes in Saskatoon. Leif Erickson Park and Boughton Park were selected as the highest priority sites, based on criteria including land availability and neighbourhood-level food insecurity.

Plants on site are still being established. Food Forests will be open to the public in spring 2028. Stay tuned!

This project is funded in part by the Government of Canada’s Natural Infrastructure Fund.

Please note: This project was moved from our previous engagement website, and some of the tools and information may appear different than originally designed or other projects on this platform.

Phases

Phases overview
Phase 1: Initial Demonstration Site Engagement
Initial Demonstration Site Engagement
Phase 2: Irrigation & Naturalization Study
Irrigation & Naturalization Study
Phase 3: Food Forest Sign Design Engagement
Food Forest Sign Design Engagement
Phase 4: Food Forest Stewardship Program Engagement
Food Forest Stewardship Program Engagement
Phase 5: Demonstration Site Design
Demonstration Site Design
Phase 6: Establishment of Food Forest Demonstration Sites
Establishment of Food Forest Demonstration Sites

Irrigation & Naturalization Study

June 1, 2023 6:00 AM - June 30, 2023 5:59 AM

From June - August 2023, the City of Saskatoon worked with a consultant to audit 21 parks to identify opportunities to optimize irrigation, reduce irrigated area and transition to naturalized landscaping. The goal was to improve the City's water use and increase resilience to climate change.

After reviewing the results of the audit, Boughton Park and Leif Erickson Park were identified to receive additional park upgrades including irrigation and naturalization improvements and other enhancements such as new pathways, site furniture, and tree planting. The coordination of the food forest project with additional park enhancements reduced construction impacts, saved time and money by reducing the number of contracts, consolidated design and installation work, and optimized the use of the federal Natural Infrastructure Fund grant funding.

Events

Past events