Connecting Millar Avenue

The City of Saskatoon reviewed the intersection of 51st Street East and Millar Avenue to identify a permanent design that addresses the safety and operational issues that exist at this intersection.

Map of area

The City of Saskatoon is reviewing Millar Avenue (from 43rd Street to Marquis Drive) for the assessment, engagement, and design of walking and cycling facilities. As part of Saskatoon’s Active Transportation Plan’s (AT Plan) implementation strategy to have shelf-ready plans, the outcome of this project is to plan and design walking and cycling facilities, and does not include construction. Additionally, this project will address the lack of a sidewalk network along Millar Avenue and will NOT be taking away vehicle travel lanes in the design.

Please note: This project was moved from our previous engagement website, and some of the tools and information may appear different than originally designed or other projects on this platform.

Phases

Phases overview
Phase 1: Round 1: Engage on Opportunities and Challenges
Round 1: Engage on Opportunities and Challenges
Phase 2: Review Feedback and Choose Preferred Alternative
Review Feedback and Choose Preferred Alternative
Phase 3: Round 2: Engage on the Proposed Design Options
Round 2: Engage on the Proposed Design Options
Phase 4: Finalize the preferred design option
Finalize the preferred design option
Phase 5: Present the Finalized Plan to the Standing Policy Committee on Transportation.
Present the Finalized Plan to the Standing Policy Committee on Transportation.
Phase 6: Prepare revisions to the preferred design option
Prepare revisions to the preferred design option
Phase 7: Round 3: Further business and property owner engagement
Round 3: Further business and property owner engagement
Phase 8: Standing Policy Committee on Transportation
Standing Policy Committee on Transportation
Phase 10: Outcome of Council Meeting: Millar Avenue Projects
Outcome of Council Meeting: Millar Avenue Projects

Outcome of Council Meeting: Millar Avenue Projects

November 2, 2026 6:00 AM - November 3, 2026 5:59 AM

Connecting Millar Avenue Project

On October 28, 2026, City Council resolved the following recommendations regarding the Connecting Millar Avenue Project:

  1. That amended Option 1b be approved, with a 3.0 metre shared use pathway on the east side only;
  2. That pathway on the north side of 43rd Street between Millar Avenue and the CN pedestrian crossing to the east be approved; and
  3. That sidewalk on the south side of 43rd Street between Millar Avenue and the CN pedestrian crossing to the east be approved.

The construction of this project is currently unfunded and it will be added to the Transportation prioritized list of projects.

51st Street and Millar Avenue Intersection Improvement

On October 28, 2026, the 51st Street and Millar Avenue Intersection Improvement – October 2026 Update report was presented to City Council.

The motion “That Option A – Improved Accessibility be approved and the rail signalization coordination be included” was defeated on a tie vote.

The subsequent motion “That Option C – Full Reconstruction of the 51st Street and Millar Avenue Intersection Improvement Functional Design Report as presented in Appendix 9 be approved” was defeated on a tie vote.